Justin Minggan's profileSuperGANの杂七杂八小破屋PhotosBlogLists Tools Help

Blog


    10/26/2010

    对这里的爱 你不懂 不会明白 Vol.2

     

    希望你可以看到此段放在YouTube上的视频。
    中国大陆的朋友们看不到的话可以试一试 http://flic.kr/p/8K6ag3 如果还不行那就爱莫能助了

    这就是波士顿的清晨 远处有一个大风车你可能看不清 刚刚开始有一家刚刚从Logan Airport起飞的小飞机 稍后又出现了前往Fisher Pier的快艇
    有树叶飘下 好像还有乌鸦在叫 当然还有风吹着麦克风的呼呼声

    就是这里。

    关于Windows Live Spaces搬迁
    虽然很操蛋 但是这是一种不可抗力 这个空间预计将会搬到 http://weiminggan.com/ 的某个位置
    还有一个短网址服务 root是 http://wei.me/ 短网址格式会类似于 http://wei.me/1a2b
    如果你想让你的空间定格下来的话 我可以帮你找个地方作为纪念堂 地址格式类似于 http://weiminggan.com/yourname
    可以将你的空间页面缓存在那里 可以看但不可以做任何改变

    推荐你去blogspot开始新的部落格 因为wordpress.com实在适应不了已经习惯这里的人们
    中国大陆的朋友们我暂时还没有好的推荐

    10/11/2010

    对这里的爱 你不懂 不会明白 Vol.1

    Boston, what is called the first city in the United States of America, has the longest history. The origin of American Revolution, the Boston Tea Party, broke out in 1773 at Boston Harbor; the first public beach of the Nation, Revere Beach, established in 1896 in Greater Boston; the first subway system in North America, Tremont Street Subway(now is a part of the MBTA Green Line), opened on September 1st, 1897. It is Fortunate that the oldest part of Boston subways is still providing services to Bostonians in nowadays. The entire public transportation system among the Greater Boston has experienced and undergone many stages, re-planning, re-constructions, and modifications. It’s hard to believe in everyday commuting on the T, we are running on the tracks which were served for hundred years.

    img_110587
    Richard Cheek - 1982

    The history of the public transportation system in Boston can be all the way tracked back to late eighteenth century. The public transportation system composed by many kinds of vehicles: from the very beginning, such as stage coaches and omnibuses; to recent years, trains, buses, and trolleys. Meanwhile, there are many different means of transportation occurred during these periods as well. From underneath the ground, subways, to the higher up, elevated railways.

    In 1793, a private stagecoach service started running between Cambridge and Boston via the West Boston Bridge, which now called Longfellow Bridge. A Stagecoach is a kind of horse-drawn vehicle provides service to the public. The first transit service in the real sense occurred in 1826, an omnibus line ran between Boston and Cambridge. The real sense transit service indicates that a form of public transportation running on a regularly scheduled basis, and the omnibus is similar to stagecoaches, but it is more like a bus. By 1830, another line was opened ran to Roxbury. These two omnibus lines used the similar routes as the two major subway lines we having now: the Red Line, and the Orange Line.

    Time flies to the mid-nineteenth century, the public had a great demand on the public transit due to the increased population during that time. The first street car service was running by horses from Harvard Square to Bowdoin Square in 1856. Begun from this time, street railways expanded rapidly in order to fulfill the great demands by the public, and people were prefer horse railways to the omnibus, it is much more comfortable. While the city of Boston were expanding and transforming from a little mercantile city to a larger business center and established connections with the suburbs as bedroom suburbs, the development of street railways faced a difficult situation that other cities didn’t have: the downtown Boston has only two main streets, Tremont Street and Washington Street. All the traffic from Cambridge, Charlestown, South Boston, Dorchester, West End and Roxbury was merged to these two streets like a funnel. This caused the whole system overloaded and made the traffic in downtown area a mess. Number of riders climbed from 50 million by 1860 to 80 million in 1885. Horses were flooded the city.

    img_110605
    Richard Cheek - 1982

    Later on, more problems became obvious to the transportation thereupon: the horse-drawn street cars were unable to travel long distance neither carry too many passengers. “Horse keeping” was also a big issue. The city considered about eht cable car but it does not feasible on Boston’s winding roads. Only until 1887, the first electric streetcar system experiment by Frank Julian Sprague got successes in Richmond, Virginia. Boston finally found a perfect solution to improve the short-coming situation, and electric street cars quickly take the place on the railroad system. More than 90% railroads were running electric street cars by 1892. The electric street car also called a trolley, which uses an over-head power line to operate; this is a kind of mid-size train we now still using on the Green Line light rail lines.

    Everything seemed went fine, but did not last long. As the amount of passengers continuously grew, the whole transit system went overcapacity again, and the downtown Boston became a mess for a second time. The city started to think a better solution to deal with the fast growing city. The elevated railroads had taken into account. There were many oppositions argued on the noise and ugliness of elevated railroads, but more and more people were in favor of that because of its breath taking feature: Fast.

    After many researches by the Legislature, the city finally issued Statutes of 1894, Chapter 548 and several later Acts that authorized Boston Elevated Railway Company to build subways and elevated railways among the City of Boston. Part of these Acts were:

    -    Stat 1894 Chap 548: An Act to incorporate the Boston Elevated Company and to promote Rapid Transit in City of Boston and Vicinity;
    -    Stat 1895 Chap 440 / Stat 1896 Chap 492: An Act relative to the Construction of Subways in the City of Boston;
    -    Stat 1897 Chap 347: An Act Relative to the Boston Transit Commission
    -    Stat 1897 Chap 500: An Act to promote Rapid Transit in the City of Boston and Vicinity

    From this point on, a new transportation system just came.  The Elevated Railways started to spread all over the city.

    img_110613
    Richard Cheek - 1982

    The government required in the Stat 1897 Chap 500 the construction of subways in the center of Boston, Cambridge, and a tunnel to East Boston under Boston Harbor. These subways are the predecessors of the Red Line and Green Line in nowadays. Especially the subway in the center of Boston, Tremont Street Subway, constructions begun in 1895 and first section opened on September 1st, 1897, was the first subway in the United States, was the state-of-the-art.

    The Boston Elevated Railway(BERy) expanded really fast from January 23rd, 1899, the first dig, to 1901, the Mainline and Atlantic Avenue loop went on service. By 1904, the entire BERy system(including street railways, elevated railways, and subways) was mainly covered every corner in Boston. It had more than 421 miles (678 km) of tracks.

    In 1900, the BERy decided to build a separate tunnel underneath Washington Street in order to relieve the traffic in the Tremont Street underground and opened on November 30th, 1908. In 1903, the authority decided to extend its elevated railway system to Forest Hills and opened on November 22nd, 1909. The Washington Street tunnel and Forest Hills extension were gradually became what we are riding now a part of Orange Line. In the same year as Forest Hills Station opened, the construction of Cambridge Subway begun as well. This long subway across the whole Cambridge is exactly what the Red Line using now. In the later years, the development of rapid transit system was more and more like the miniature of contemporary MBTA rapid transit system.

    img_110658
    Richard Cheek - 1982

    Changes came to the Boston public transportation again during the following decades in twentieth century. The automobile industry had a great development, thus a new kind of vehicle was in vogue, the bus. The first bus route ran between Central Square and Oak Square in 19223, and it became the route 64 as the MBTA operates nowadays. The convinces and flexibility made Bostonians in favor of buses, and since then, the BERy started to replace trolleys with buses or trackless trolleys. By 1985, only several street railways remaining in service, those routes are basically today’s Green Line branches. During that time, more and more households owned personal automobiles, this caused a great decline on ridership of the public transportation. Street Railways were being removed from streets, and Elevated Railway services were being cutback.

    Finally in 1960s, the Massachusetts Bay Transportation Authority (MBTA) created and started in charge of rapid transit, bus, commuter boat, and commuter rail among the greater Boston. The layout of public transportation was substantially shaped up by the end of twentieth century:

    -    The Green Line (A, B, C, D Branches) and Mattapan High Speed Line: the only trolley street car services left;
    -    Orange Line: used to be the Main Line of Elevated Railway Services and modified, extended and reconstructed;
    -    Red Line: was the combination of Cambridge subway and extension to Quincy area;
    -    Blue Line: converted from East Boston subways and railways.

    During late twentieth century and beyond, only small modifications have been made to the MBTA system. The Green Line A Branch replaced by route 57 bus in 1969; and the E branch suspended its service between Heath Street and Forest Hills(Arborway) since December 28th, 1985. In 2002, the Silver Line has introduced to the public. This is a BRT (bus rapid transit) service along Washington St. and sooner extended to Airport and Waterfront.

    img_78240
    Ed Davis, Sr. - Sept 1973

    In recent years, many renovation projects have applied to the system in order to generate a modern public transportation system in twenty-first century. At the same time, some suggestions of extend the service to further places are being considered, like the Green Line E Branch Lechmere extension and the Blue Line Bowdoin extension. The oldest city in the United States is keeping itself advanced with the time.

    4/21/2008

    眾人成日踩親條尾,沒有人能夠事急馬行田,話頭醒尾。赦之。

    就好像是 一个东西被装在了一个并不符合他的容器里 但却又拼命得想要把它装进去 这可能吗?

    我觉得这样只会把自己搞疯 越来越疯 真怕我那天突然受不了了 然后就自尽了 这样很简单

    我真的不知道该怎么办了
    迷茫 徘徊 捉摸不定 在所有的物体之间 然后不知所措 他想 他又不敢 他又希望 他又害怕
    这样就是 睇啱

    我不知道我在做什么
    很少有人知道自己在做什么 知道自己在做什么的人又很少有人能够按照自己的意愿一直做下去 大家曾经都很土 很土很土 Couldn't be 土er

    我不知道我这是怎么了
    一直抱有的幻想 你们无厘头得发疯 都在和我作对 我不知道我是不是该要投降了

    我害怕你们 我害怕。是不是要选择离开呢?

     

    出咗半斤力,想話攞返足八両。

    11/3/2007

    吉他是个挺容易完腻的东西 Vol.2











    部分照片是Panda拍摄的。

    我那题目白写了...          

    容易忽略的东西:其实背景音乐很好听的。

    11/1/2007

    吉他是个挺容易玩腻的东西 Vol.1













    谢谢以上几位借给我肖像权。

    6/8/2005

    地球吓了一大跳 Vol.5

    绵阳市南河体育中心 北川灾民的第二安置点 人口约15000
    大家都被安置在搭建在体育场中的大长帐篷中


    这就是大家捐赠过来的食品


    由于唐家山堰塞湖泄洪的危险 现在这里已经全部清空了 部分已经回到居住点重建家园 部分被转往九州体育馆
    整个绵阳已经做好了一切危险发生马上启动应急预案进行撤退的准备

    希望危险马上过去

    6/2/2005

    地球吓了一大跳 Vol.4


    很多人会奇怪的问 这是北川中学?北川中学不是已经塌了嘛
    这里是 长虹培训中心 "四川省北川中学"这个大木牌子是在高三孩子们复课前一天 长虹集团派人专门从废墟里找回来的 它代表着北川中学精神永存


    北川中学有大概3000学生 现在只剩下1000多 有100多人仍未与家人取得联系 有15人已经确定父母已经阵亡


    孩子们回忆说:
    在之前几天就已经有过很多次前震 但都是晃几下就没事了 老师还让我们呆在教室里不要动
    当那天下午又开始晃起来了 老师还是叫我们不要慌 但是我们都发现越来越不对劲了 晃的力度越来越大了 然后我们就都开始往外跑
    我们刚跑了几部还没有跑出教室 我们这层就塌了下来 然后我们班很多同学都被压在了下面
    我们教室在二层 当时我们楼只有一二层发生坍塌了 三四五层都没什么事
    然后我们就开始往外爬 很多同学都自己爬了出来 比较庆幸的是 我们班全部生还

    那你们班主任呢?
    他当时在另一栋楼给别的班上课 没能逃出来...

    你们的家长现在都在什么地方?为什么不和他们在一起?
    他们应该有些在那个体育馆吧 因为这里比较安全啊 我们都想呆在这里 而且家长也希望我们呆在这里 但还是自愿 有些学生就被家长接走了



    高三的孩子们已经复课 高考推迟对他们来说是理所当然的 不知道这些孩子们在经受过这样的挫折之后心态调整得如何 没有与他们做更多接触 只是看到中午休息时间有很多孩子仍然在刻苦 有小组在讨论问题 还有小情侣在互帮互助 看起来好像很和谐

    突然楼外有个老师大喊:
    地震啦 大家都赶快出来!!!

    于是大家匆匆忙忙的全都跑出了教室 这事经常发生 我在这里一天就感受到了3次余震


    远处是篮球场 男孩子们像平常一样打着球 有很多女孩子们也像平常一样坐在场边看 时不时地窃喜 或者小激动一下

    这边是正在给女生们发衣服 不知道这是北京五道口哪家小衣店捐来的这么多小内衣 还全都是系带的 赫赫 ...

    后来一个北川中学的朋友发短信告诉我他们高二马上也要复课了 可能还需要在这个地方呆很长时间
    晚上很热很潮 睡觉很不舒服 过段时间又该有蚊子什么的了

    还有 临走的第二天 温家宝爷爷又一次来到了这里...

    真心的希望孩子们都能够很坚强的早日渡过难关

    5/31/2005

    地球吓了一大跳 Vol.3


    四零四医院 我到的第二天温家宝爷爷就来这了 但是我不能在绵阳过夜所以错过了与老大面对面零距离接触的机会


    绵阳市肿瘤医院 所有的病人们已经全部都转到医院外面附近的一片空地上 地震中的重伤员已经全部都转运到外省的各大医院 现在在这里疗伤的有一部分是原有病人 还有地震中受轻伤的病人们 大部分来自北川 他们很多人至今还未与家人取得联系


    护士和医生们都已经筋疲力尽
    "前几天吃的都是方便面 这两天有医院的厨房给做饭了 但是那个可难吃啦"
    "现在是24小时轮流制工作 我们就睡在后面这个帐篷里面 有的人睡在医院的宿舍里"
    "现在做很多事情都不方便 医院搬到外面导致很多医学仪器使用起来比较麻烦"
    "哎呀 累啊"



    这里是绵阳市政府 为了安全起见也为了办事方便快捷所有的部门都汇集到了同一层 各种机制以及体系在事件发生的第二天就已经完善的建立起来

    旁边就有人说:这种突发事件换到别的省 他们应付得绝对都没有四川省好

    5/26/2005

    地球吓了一大跳 Vol.2

    这里就是新闻天天在说的地方 绵阳

    香樟树是他们的市树,马路两旁栽的全都是
    绵阳是四川省的第二大城市,是四川省“十五”规划中首批建好的百万人口城市之一。又因其科技实力比较雄厚而被誉为"中国西部科学城"


    当前最新的公告内容:

    绵阳市抗震救灾指挥部 第9号公告
    广大市民:
      当前,我市抗震救灾工作正处在十分紧急、十分严峻的时刻,各项救灾措施正在加紧落实,各地救灾工作都在紧张进行。"5.12"地震灾害后,社会各界高度关注,纷纷通过各种途径和方式积极援助灾区,部分群众还自发赴地震灾区进行救灾慰问活动,其精神和热情令人感动,值得肯定。但由于灾区道路损毁严重,加之专业救援队伍和救灾物资急需运往灾区,为了优先保证运送专业救援队伍和救灾物资的车快速通行,为全省、全市抗震救灾工作的顺利进行创造良好的条件,根据省委、省政府(川委办发电[2008]26号)通知精神和抗震救灾的需要,请各地、各部门和企事业单位加强组织协调,做好宣传解释,引导献爱心的单位和群众采取就地就近捐款捐物等方式,到市抗震救灾指挥部捐赠处和指定的银行帐号捐赠,为灾区群众献爱心,为抗震救灾作贡献,确保全省和我市抗震救灾工作有序、高效开展。
    2008年5月16日



    市区的居民们几乎全都在街边或公园里搭起了帐篷 因为每天一两次的余震让他们根本不敢回楼房里安心入睡
    现在他们还没有恢复正常的工作和学习 出租车在正常运营 很多小餐馆的生意一下子火了起来 还有肯德基麦当劳什么的 也经常爆满

    尽管如此 人们的情绪都还是很稳定的 他们期待着能够尽早恢复他们原来的生活 继续上学上班

    四川人很坚强。

    5/23/2005

    地球吓了一大跳 Vol.1

    这个时候是5月21日 全国哀悼日的最后一天 这三天来成都的人们一直都激情高涨 但是今天应该是最热闹的

    下午的时候一拨由学生自发组织的游行以 天府广场 为起点 一路沿着 总府路 途径 提督街 顺城大街 等 最终又回到了 天府广场

    途中不时有街边的人们加入到游行队伍中来


    这是他们喊的口号: 中国加油 四川雄起 汶川挺住

    天府广场北面的国旗下 堆放着许多前来哀悼的人们所献的花 还有很多条幅和文字
    东边的几棵树上还挂着用来悼念那些人们的白色纸花

    在来成都的路上 有一位同行的绵阳人 他在北京某酒店上班 现在单位放假让他回家乡来看望家人们
    我问他 家里人都还好么? 他说 家人都还在 死了3个亲戚 但是房子裂了不敢住 都睡在外面

     

    最近很热销。


    晚上的天府广场一下子聚集了上万人 用各自不同的方式来表达他们对灾难的心痛之情

    游行 烛光默哀 吟诵 大声歌唱及喊口号 合影留念 签字 献花儿

    中国最强 四川必胜